Product Detail :
|
Supply of ms tank (2.5 kl) modification & leg fabrication with material (sheet) primer & paint on ms tank inner/outside (tank will be connect with two water jet ejector) ,ms/ss welding rod , ms ( band 3”/2”/1”,flange 3”/2”/1”,drain nozzle 1”,side nozzle 3”) gasket ,nrv, ventury ss nozzle 01 no.empuller ss-01no, nut bolt, (pump suction) old water jet ejector dismantle 2no., shifting and refitting on the first floor with ms water tank pipeline to receiver to main pipe line installation/successful trial.
|