|
Product Detail :
|
UNDER FRAME COMPLETE FOR LHB SCN (EOG) COACHES. . * UNDER FRAME COMPLETE FOR LHB SCN (EOG) COACHES Note-(1)CRF items are to be
manufactured as per Dy. CPLE-III letter no. RCF/HSQ/PLG/MPSH/510003/LHB DATED 04/04/2024. (2) P
ROTECTION PROCEDURE AS PER DY CPLE-III ANNEXURE-APP DATED 14/05/2024. Note-(3).MOUNTING A
RRANGEMENT ON UNDERFRAME FOR BIOLOGICAL TANK AS PER DRG No. LE11442 ALT f ., as per Dra
wing LS11196 ALTg & AS PER SCHEDULE OF TECHNICAL AS PER SPECFICATION NO. MDTS21320 REV
-02 DATED 09.06.2020 02 & MASKING AS PER DRG. NO. MI007679 ALT.nil NOTE 1. SUPPORTING ME
MBER ON TROUGH FLOOR TO DRG.NO. LS10206 ALTf, Packing Instruction PI042 VER 3.0. [ Warrant
y Period 84 Months after the date of delivery ] ]
|
| Tender Detail : |
UNDER FRAME COMPLETE FOR LHB SCN (EOG) COACHES. |