|
Product Detail :
|
UNDER FRAME COMPLETE FOR LHB SLR COACHES. . * UNDER FRAME COMPLETE FOR LHB SLR COACHES Note-(1)CRF items are to be manufa
ctured as per Dy. CPLEIII letter no. RCF/HSQ/PLG/MPSH/510003/LHB DATED 04/04/2024. (2) PROTECTI
ON PROCEDURE AS PER DY CPLE-III ANNEXURE-APP DATED 14/05/2024. Note-(3).MOUNTING ARRANGE
MENT ON UNDERFRAME FOR BIOLOGICAL TANK AS PER DRG No. LR11961 ALT d ., as per Drawing L
R11873 ALT.b SCHEDULE OF TECHNICAL REQUIREMENT SPECIFICATION NO. MDTS21320 REV-02 & M
ASKING AS PER DRG NO MI007679 ALT. nil NOTE BRACKETS TO DRG NO LR36611 ALT. a(QPC=1 no
s.) & LR36612 ALT. c(QPC=1 nos.) ARE TO BE SUPPLIED AS LOOSE ITEMS., Packing Instruction PI042
VER 3.0. [ Warranty Period 84 Months after the date of delivery ] ]
|
| Tender Detail : |
UNDER FRAME COMPLETE FOR LHB SLR COACHES. |