|
|
|
|
|
6
|
Sector
|
Sugar Tenders
|
Tender Value
|
N.A.
|
Location
|
Punjab Tenders
|
Ref.No
|
60427728
|
Closing Date
|
19 - Jun - 2023
|
20 Days to go
|
View Tender Details
|
|
Contract Jobs of Dismantling, Fabrication and Erection for the Year 2023-24 #*. Contract Jobs of Dismantling, Fabrication and Erection , Dismantling of M.S. Pipe, 1" to 12" dia , Erection of M.S. Pipe 1" to 12" dia, Fabrication of M.S. Pipe Line above 12" dia from M.S. Plate, Dismantling of M.S. Pipe Line above 12" dia, Erection of M.S. Pipe Line above 12" dia, Fabrication of S.S. Pipe Line 6" to 24" dia from S.S.plate, Dismantling of S.S. Pipe Line 6" to 24" dia , Erection of S.S. Pipe Line 6" to 24" dia from S.S. Plate, Fabrication of Nipple 1" to 12" dia , Erection of Nipple 1" to 12" dia , Dismantling of Nipple above 12" dia , Fabrication of Nipple above 12" dia , Erection of Nipple above 12" dia , Dismentling of Bend 1" to 12" dia, Fabrication of Bend 1" to 12" dia, Erection of Bend 1" to 12" dia, Dismantling, Fabrication and Erection of Bend above 12" dia from MS plate, Dismentling of Reducer/Tee 1" to 12" dia , Fabrication and erection of Reducer/Tee 1" to 12" dia , Dismantling of Valve 1" to 12" dia, Erection of Valve 1" to 12" dia, Dismantling of Valve above 12" dia , Erection of Valve above 12" dia, Cutting and fitting of Old Flanged/ Blind 1" and above , Dismantling Fabrication and Erection, of Platform, Dismentling , Fabrication and Erection of Railing, Replacement of worn out Bottom plate of Molasses/Syrup Storage Tank., Fabrication of Vapour Pipe Bend 36" to 40" dia, Dismentling and Erection of Vapour Pipe Bend 36" to 40" dia, Dismentling, Fabrication and Erection of Umbrella of quad body, Dismentling, Fabrication and Erection of Umbrella of Pan body, Dismentling Fabrication and erection of Strainers, Dismentling Fabrication and erection of bed of any type of pumps and motor or reduction gear box with motor., Dismantling of vapour pipe 36" to 40" dia, Fabrication of vapour pipe 36" to 40" dia, Erection of vapour pipe 36" to 40" dia, Dismantling, Fabrication and Erection of Save all of pans from 8 mm to 12 mm M.S. Plate, Dismantling, Fabrication and Erection of Save all of quads from 8 mm to 12 mm M.S. Plate, Dismentling, Fabrication and Erection of top Plate of save all of Pan and quad, Dismentling, Fabrication and Erection of outer shell of save all of Pan and quad, Dismentling, Fabrication and Erection of inner portion of save all of pan and quad, Replacement of J-Pipe in vapour cell/Quad Body/pan, Dismantling, Fabrication and Erection of Coil of Molasses Tank, Patch work , Stengthing of Umbrella of Pan/ Evaporator Bodies , Dismentling, Fabrication and Erection of broken arms of any crystallizers., Dismentling, Fabrication and Erection of wornout shaft of crystallizer , Fabrication and Erection of Distributor in down take of Pans, Replacement of Bottom compartment Grooves for fitting of rubber strips of juice heaters., Erection of Super heater at centrifugal machine with all existing connections, Dismentling & Erection of Transient heater with all existing connections above Centrifugal machine., Dismantling, Fabrication and Erection of injection header size 600/800mm dia with 10mm plate, Replacement of Pan body shell from Calenderia to top cone , Replacement of worn out pan body shell upto 1.25 mtr portion or part, Dismentling, Fabrication and Erection of Top cone of pans, Replacement of RVF agitator , Replacement of MS Flat/runner/side plates/MS railing/square bar etc. for chains of Mill House., Replacement of MS Bottom Trough of RBC/BE Chain, Replacement of runner along with supporting angle/ channel for Cane Carrier chain / inter carrier chain, Dismantling, Fabrication & Erection of MS plate of cane carrier side plates with supports , Dismantling & erection of platform from old scrap material, Dismantling & erection of IBR pipeline upto 6” Dia , Dismantling & erection of IBR bends/reducers/nipple Upto 6” dia , Dismantling and erection of IBR valve upto 6” dia, Fabrication and Erection of Flanged end Observation / Cleaning doors for Economiser of Boiler no. 2, Dismantling, Fabrication , Erection of Boiler ID fan flue gas ducting , Replacement of Shell of Wet Scrubber along with MS Mesh from MS plate, Dismantling, Fabrication Erection of FD fan ducting of Boiler no.2 with supports , Patchwork of Wet Scrubber casing/Ducting/bottom cone/Clarifier, Dismantling, Fabrication Erection of Damper of ID/FD Fan of Boiler with supports, Fabrication and fitting of ID fan suction bend for Boiler , Dismantling and fitting of existing ID fan duct from ID fan to wet scrubber along with supports etc for Boiler , Patch work of outer front MS plate of chamber near bagasse feeder Boiler, Dismantling , Fabrication and erection of MS ducting from Wet scrubber outlet to chimney for boiler , Dismantling , Fabrication and erection of MS ducting one meter long at suction of Wet scrubber for boiler , Dismantling , Cleaning , Testing , Painting and refitting of Gilled Type Economiser Elements . No. of elements are 48 no.'s. Hydraulic Test also to be done after fitting of all elements., Dismantling , Fabrication and er
|
|
|
|
|
|
|